Free project-controls tool / 01

EAC Calculator

Turn cumulative earned-value inputs into an inspectable EAC/ETC estimate and a concise variance story.

Need a credit rule first? Build one

Input sheet

Enter cumulative values

Use the same currency, reporting date, and control account scope for each value.

Authorized total budget for the scope.

$

Budgeted cost of work scheduled to date.

$

Budgeted cost of work performed to date.

$

Actual cost incurred to date.

$

Open commitments; shown as context, not used in formula.

$

Your forecast will appear here

Enter BAC, PV, EV, and AC to generate a transparent first-pass EAC estimate.

Tip: load the example to preview the result layout.